Total overview

(Every 5 minutes this page is automatically reloaded.)

Energy and Power

PV production

  Today Yesterday This Month Last Month This Year Last Year Lifetime
Total Energy production 14.500 kWh 35.200 kWh 458.400 kWh 818.700 kWh 5.039 MWh 6.259 MWh 17.256 MWh
Winschoten 1 6.900 kWh 16.800 kWh 218.600 kWh 391.000 kWh 2.189 MWh 2.954 MWh 9.900 MWh
Winschoten 2 7.600 kWh 18.400 kWh 239.800 kWh 427.700 kWh 2.850 MWh 3.305 MWh 7.356 MWh
Total CO2 reduction 6.5 kg 15.8 kg 206.3 kg 368.4 kg 2267.6 kg 2816.7 kg 7765.3 kg
Total Money saving € 3.19 € 7.75 € 100.84 € 180.11 € 1108.53 € 1367.74 € 3786.98

Smart meter summary

  Today Yesterday This Month Last Month This Year Last Year Lifetime
Energy Import 2.080 kWh 4.233 kWh 49.203 kWh 84.487 kWh 2.069 MWh 3.409 MWh 9.205 MWh
Energy Export 14.852 kWh 34.881 kWh 436.862 kWh 707.232 kWh 3.931 MWh 4.387 MWh 12.797 MWh
Energy Import-Export -12.772 kWh -30.648 kWh -387.659 kWh -622.745 kWh -1862.046 kWh -977.472 kWh -3591.781 kWh
Local consumption 1.728 kWh 4.552 kWh 70.741 kWh 195.955 kWh 3.177 MWh 5.282 MWh 13.664 MWh
Direct internal PV consumption -0.352 kWh 0.319 kWh 21.538 kWh 111.468 kWh 1.108 MWh 1.872 MWh 4.459 MWh
Gas usage 0.000 m3 0.000 m3 0.000 m3 0.397 m3 135.134 m3 292.009 m3 798.358 m3

System status: Winschoten 1

  State Time Received Additional Info
System Status Ok 2 minutes ago. (14-08-2020 15:45:00)  
System Output Ok less than 1 day ago. (13-08-2020)  
Last error msg Normal / Recovered 26 days, 20 hours and 40 minutes ago. (18-07-2020 19:07:00) Last error msg: The measured AC voltage is out of tolerable range

System status: Winschoten 2

  State Time Received Additional Info
System Status Ok 2 minutes ago. (14-08-2020 15:45:00)  
System Output Ok less than 1 day ago. (13-08-2020)  
Last error msg Normal / Recovered 26 days, 20 hours and 40 minutes ago. (18-07-2020 19:07:00) Last error msg: The measured AC voltage is out of tolerable range